REPORT OF FINDINGS
- REPORT OF FINDINGS -
- Project manager distributed the task among the team members to work on inception report. The inception report must contain base on the picture below:
- After collecting data and analyzing results, we must prepare all this information in a written report. The Report of Findings (RoF) summarizes main points but also provides interpretations of our observations or data. The Report of Findings consists of a report of technical findings including data analysis and synthesis, maps, figures, and initial proposal of River of Life Special Area Plan, strategies, initiatives, and programs.
- From all the data we collected about Langat River, our project site for River of Life Special Area Plan, we managed to tabulate them into figures and tables. Among others, we collected data on land-use in Langat River, Site profile, water Quality, Micro-climate, ecological, and survey. and is not spared from the threats of environmental issues. Bangi, Hulu Langat River suffers from issues like hazardous waste, water pollution, noise pollution, air pollution, and cleanliness and hygiene.
- EcoThunder Corp is a consulting business commissioned to provide multidimensional development planning as a core value while reducing river pollution and improving lifestyles at Langat River in accordance with project timetables and projects slated to be developed by our consultancy firms for the construction of Special Area Plan by aiming:
1.To formulate water quality in monitoring plan as well as waste management to build more sustainable cities and communities in accordance with the GEC and River Care Programmed
2.To develop River of Life Special Area Plan in reducing water and waste pollution.
3.To develop a green city in Langat River region which enhancing the livelihood of the citizens following existing program and initiatives provided.
- With the team role and organization chart above we can proposed the River of Life Special Plan Area.
- According to the framework above, our company can finished all the project requirement on time and make sure all the needed information, data are fulfilled.
- Eco Thunder, presented the Draft of Proposed Inception Report (report of finding). After go through our proposal report, Dr have advised us to make some amendment in our proposal, during crit session.
-DATA PROJECT KEY FINDINGS-
- The objective of this data finding are to examine the current water quality in Langat river and to compare the water quality of Langat River with National Water Quality Standards for Malaysia in Langat River. Based on the results, it can be analyzed that the water is safe but required an extensive treatment as the water sample is classified in class II.
- Some of team members are need to go to site for water quality assessment.
- The objective of this data is to study the possible factors that affect the environmental humidity of the study area. and to investigate the micro-climate in the Langat River. Based on the data, the Humidity at the urban area is at high level due to the land use and ecosystem structure at the study area. The microclimate at the urban area is more suitable for commercial use and transportation.
- the aim of this survey is to find out Social Impact Analysis on Environmental Impact Assessment on water Quality with an Area of 2km in Langat River, Bandar Baru Bangi, Hulu Langat Selangor. Each of the respondents opinions are particularly important to improve the management of Langat River. Based on the results, we can analyzed that the respondent are highly agreed with the proposed this project for improvement.
- This Environmental Management Plan will identified environmental concerns that are expected to arise, as well as solutions that can be implemented to mitigate any negative consequences that may arise as a results of the planned development.
- In conclusion, to develop the River of Life Special Area Plan in reducing water and waste pollution formulating water quality in monitoring plan as well as waste management in order to make a green city in Langat River region which enhances the livelihood of the citizens following existing programmed and initiatives provided.
- Here is the final report of proposed report of finding.














Comments
Post a Comment